Skip to content
Home » How to Prevent Cost Overruns in Construction Projects: Essential Tips for Engineers

How to Prevent Cost Overruns in Construction Projects: Essential Tips for Engineers

cost overruns

Building codes are still important for safety, compliance, and credibility in the fast-paced and important field of construction.

In the event that you are an engineer, architect, contractor, or project manager, how well you understand and follow building codes can affect how quickly a project gets approved or gets stuck in regulatory problems.

Understanding building codes is important, and this blog posts talks about how platforms like ArQonZ help professionals stay in line while saving time and resources.

What are the rules for building?

 Building codes are uniform rules and technical specifications that tell people how to design, build, change, and take care of structures.  These rules are in place to make sure that buildings are: 

  • Structurally sound 
  • Safe for people to live in 
  • Energy-efficient 
  • Able to withstand disasters 
  • Environmentally friendly

The National Building Code (NBC) and the IS codes from the Bureau of Indian Standards (BIS) set most of the rules for building in India.  Depending on where you are, you may need to follow more local and state laws.

Why building codes are important for engineers

1. Makes sure the structure is sound

Engineers are very important for making sure that building designs and construction meet safety standards like wind loads, seismic resistance, load-bearing capacities, and fire safety rules.

2. Speeds up approvals by the government

Following the relevant building codes speeds up the approval process with city officials and lowers the risk of legal problems during the building and moving in phases.

3. Doesn’t cause duplication or sanctions

Code violations often lead to expensive repairs, fines, or orders to tear down buildings.  Following the rules from the beginning of the design process helps reduce these problems.

4. Gives the project more credibility

Engineers make sure that code is followed, which is important for both clients and developers.  It makes you look better as a professional and makes it easier to get jobs on important projects.

Important building codes that every Indian engineer needs to know

The following important codes must be known by engineers: 

  • NBC 2016: The National Building Code of India (covers things like safety rules, plumbing standards, HVAC requirements, fire safety rules, and more). 
  • IS 456:2000: Code for Plain and Reinforced Concrete 
  • IS 875 (Parts 1–5): Load calculations (dead loads, live loads, wind, and seismic) 
  • IS 1893: Earthquake-resistant design 
  • IS 13920: Ductile detailing of RCC structures subjected to seismic forces 
  • IS 3370: Standards for water-retaining structures 
  • IS 732: Electrical wiring code 
  • Energy Conservation Building Code (ECBC): Guidelines for energy efficiency

 It is very important to know how to use these codes correctly during design reviews, site implementation, and inspection audits.

The time and cost savings of following the rules have business effects.

A lot of engineers and project leaders don’t think much about building codes, which can cause problems like: delays in getting the project approved; budget overruns because of redesign or rework; disagreements with clients or vendors; legal problems after the construction is done.

Compliance is more than just checking off boxes; it includes managing costs and reducing risks in a strategic way.

And this is where ArQonZ’s unbeatable business value lies.

ArQonZ’s role in helping to keep code compliance

ArQonZ is India’s best digital platform for construction professionals. It makes it easier to buy materials, manage vendors, and keep an eye on specifications, all while being completely open and code-compliant.

✠ A list of materials that are ready to use

All of the products on ArQonZ, from cement to waterproofing membranes, are labeled with IS compliance indicators, technical specifications, and certifications to make it easier for engineers to choose the right ones.

✠ A digital list of the quantities  Upload with mapping of specifications

Once you send us your BOQ, our AI tool will look for mistakes or missing specs that are in line with the relevant building codes. This will save you hours of manual review.

✠ Network of confirmed suppliers

All vendors on ArQonZ are checked to make sure they follow building material standards. This makes sure that your supply chain meets government standards.

✠ Electronic documentation and checklists work together

Site engineers and project managers can use ArQonZ’s tools to keep up with code-required compliance paperwork, inspection checklists, and quality control reports.

Contractors, architects, and developers can get help.

Whether you work alone or for a big company, ArQonZ has tools that can help you fill in gaps in your knowledge, speed up the procurement process, and keep teams from breaking the rules.

Finally, some thoughts

These days, people who work in construction have to know about building rules.  For engineers, the goal is not just to build strong buildings; it’s also to make sure they are safe, legal, and approved.

Understanding building rules isn’t just a technical requirement; it’s also good for business.  When platforms like ArQonZ allow it, it gives you an edge over your competitors.

Leave a Reply

Your email address will not be published. Required fields are marked *

Index